From first visit to switch-on — handled in-house.
Five clear steps. We manage the engineering, the permits and the Meralco paperwork, so going solar feels simple from your side of the table.
The VServe solar installation process.
From the initial site visit to system activation, VServe Solar handles every step in-house — no subcontractor hand-offs, no gaps in accountability.
Site assessment
An engineer visits your property to evaluate roof condition, electrical panel capacity, shading and your current consumption pattern.
System design & quotation
We size the system to your kilowatt-hour usage and roof footprint, then deliver an itemised bill of materials with a fixed quotation.
Permits & Net Metering application
Distribution-utility paperwork, single-line diagrams and Meralco Net Metering enrollment are handled end-to-end on your behalf.
Installation & commissioning
Mounting, wiring, inverter setup, monitoring configuration and full electrical safety testing are completed by our certified crew.
Activation, monitoring & maintenance
Your system goes live and is monitored remotely. Free cleaning is included after the first year of operation.
How Meralco Net Metering and RA 9513 work.
Republic Act 9513 — the Renewable Energy Act of 2008
Under RA 9513, end-users in the Philippines may install renewable energy facilities of up to 100 kilowatts on their property. The law establishes the legal framework for renewable energy adoption and the incentives that come with it.
Excess electricity exported to the grid is credited against your monthly bill through the Meralco Net Metering Program. VServe Solar handles the documentation, single-line diagrams and distribution-utility coordination required to enroll your system — you do not deal with Meralco directly.
For us to quote accurately, we'll need:
Have these ready and we can turn your free inspection into a precise, itemised quotation fast.
Recent electric bill
A clear photo of your most recent Meralco bill so we can read your consumption.
Location & building photo
Your exact location or a Google Maps link, plus a picture of the building.
Meter & panelboard photos
Pictures of the electric meter location and your main electrical panelboard.
Ready when you are.
Book your free ocular inspection and we'll take it from there — design, permits, Net Metering and all.